Sign In | Join Free | My splicd.com
splicd.com
TIANJIN ESTEL ELECTRONIC SCIENCE AND TECHNOLOGY CO., LTD
TIANJIN ESTEL ELECTRONIC SCIENCE AND TECHNOLOGY CO., LTD
Home > AC220V Air Conditioner >

TC06-160JFL/01,1600W AC220V Air Conditioner,For Outdoor Telecom Shelter/Room/Base Station

TIANJIN ESTEL ELECTRONIC SCIENCE AND TECHNOLOGY CO., LTD
TIANJIN ESTEL ELECTRONIC SCIENCE AND TECHNOLOGY CO., LTD
Country/Region: China
Tel: 86--13752765943
Contact Person:
Ms Fiona Liang

TC06-160JFL/01,1600W AC220V Air Conditioner,For Outdoor Telecom Shelter/Room/Base Station

Place of Origin : China
Brand Name : ESTEL
Certification : ISO9001:2008
Model Number : TC06-160JFL/01
MOQ : 1 Set
Packaging Details : Wooden Case
Delivery Time : 10 days
Payment Terms : T/T
Supply Ability : 5000 Sets Per Year
Contact Now

AC220V, 1600W Air Conditioner

1. Description

The AC Air Conditioner is a full automation temperature control product. It uses intelligent controller to control the whole system of the air conditioner. According to the variation of environment temperature, the intelligent controller can automatically detect, operate and record the whole system’s operating time, power consumption, event and historical data. It can store 100 event records and 1280 historical data records, and can enquire 256 days’ daily record information. The product is widely applied in telecom cabinet, small and medium sized telecom room, UPS room, outdoor base station room, etc.
2.Features
(1)Strong adaptability
(2)High intelligence
(3)High precision
(4)High reliability
(5)Low noise
(6)Low energy consumption
(7)With 4 way switching value detection
(8)With 1 way room air conditioner control
(9) Voltage input range: 220VAC±25% 50/60Hz
(10) With dry contact alarm output
3.System Principle Diagram
Diagram 1: System Principle Diagram
4.Standard Compliance 

Standard

Description

GB/T 17626.7-1998

Electromagnetic compatibility

GB4706.1

Safety of household appliance and electrical appliance with similar use.

GB4798.1

Environmental conditions existing in the application for electric and electronic products - storage

GB4798.2

Environmental conditions existing in the application for electric and electronic products - transportation

GB4798.3

Environmental conditions existing in the application for electric and electronic products - usage

5.Technical Parameters



Environmental Performance

working environmental temperature

-20°C ~ 55°C

storage working temperature

-50°C ~ 70°C

working humidity

≤95%

Thermal Performance

rated cooling capacity

1600W(L25 L35)

1500W(L35 L35)

heating input power

300(optional)


Electrical Performance

rated input current

2.15A(L25 L35)

2.35A(L35 L35)

rated input power

473W(L25 L35)

517W(L35 L35)

input voltage

AC220V/50Hz

(187V ~ 264V)

Diagram 2: Dimension Diagram


6.Installation and Electrical Wiring
6.1 Preparation Before Installation
(1) Prepare the tools in the following table “Installation And Maintenance Tools”.
(2)Check the air vents to ensure there’s no unnecessary items on the vents.
6.2 Installation And Maintenance Tools

Tools Name

Function

Cross Screwdriver

Fix air conditioner.

Small Slotted Screwdriver

Wire power supply port on the panel

Wire Stripper

Wire stripping

Wire Crimper

Crimp power supply for equipment

Multimeter

Check the wiring to ensure it’s correctly connected and without short circuit.

Clamp Meter

Test operating current of the air conditioner

6.3 Installation Steps
(1)Make sure the air conditioner is not connected with power.
(2)Fix the air conditioner according to the Dimension Diagram.
(3)Strip the insulation of the power supply wire, and crimp the terminal.
(4)Connect the wires according to the Electrical Wring Diagram.
(5)After finishing the wiring, use the multimeter to check if the electric circuit is normal. Then connect the air conditioner with power supply, and use clamp meter to test the operating current.
Note: Make sure to disconnect all the power supply to the air conditioner before installation. Choose proper wire diameter and test operating current according to the technical parameters of the air conditioner.
6. 4 Electrical Wiring Diagram
Diagram 3 Electrical Wiring Diagram
Wiring Ports:
L N PE : power supply port (voltage input: 220VAC±25% 50/60Hz)
A+ B- GND : communication port
AL1 AL2: general alarm output port
F+ F- : direct ventilation output port
N : not connected pin
7.After mechanical installation and electrical installation are finished, check the installation items.
(1)Make sure the air conditioner is firmly installed.
(2)Check the electrical installation circuit, and ensure it doesn’t have short circuit.
(3)Check the air outlet, air inlet, internal fan and external fan of the air conditioner, and ensure they don’t have any odds and ends.
(4)Connect the air conditioner to power supply, and test the power supply (voltage input: 220VAC±25% 50/60Hz), operating current 1A±4%.
8.System Control
8.1 Control Board
(1)Technical Parameter
a.2×16 Chinese/English shift LCD display, user friendly;
b.Simultaneously display temperature and humidity inside the box and communication room temperature;
c.Temperature measurement accuracy: 0.1 °C; humidity measurement accuracy:5%;
d.Can store 180 days’ daily event record, 1 record every day;
e.Daily highest temperature, lowest temperature, average temperature
f.Daily event record;
g.Save the former day’s daily data at 0:00 every day; Can query 180 days’ daily record information;
h.RS485 communication,RTU-Modbus protocol, support remote detection and control;
i.Controllable air conditioner quantity:2 sets. 1 set of air conditioner for communication room, and 1 set of small air conditioner for thermostatic box.
j.Control mode: pulse (Non dry contact air conditioner), conducting (dry contact air conditioner)
k.Real-time control air conditioner on/off
l.Power supply: AC85V~265V/50HZ;
m.Power consumption:≤5W;
n.Working environment: -30°C~70°C;<90%RH;
o.Installation method: guide rail,hanging;
p.Dimension(L*W*H):150mm×190mm×45mm
(2)Operating Instruction
It uses English interfaces, which can be operated easily. All the operations can be realized with four buttons. The following is the control board diagram:
Diagram 4 Control Board Diagram
8.2 Buttons
PgDn:page down button, confirm button.
Press once and release the button, page down;
A long press on the button, enter or exit parameter status;
At operating status: can select three display interfaces;
At parameter status: revise, confirm and parameter page down button; a long press on the button to exit parameter status.
▲:increasing parameter revision. Page down button for event query.
▼:decreasing parameter revision. Page up button for event query.
PgUp: page up button; the function is oppose to PgDn operation.
8.3 Operating Interfaces
The controller includes four types of working modes: operating mode, parameter mode, manual operating mode, and query mode.
(1) Operating Mode:
The mode is normal working mode. There are three operating interfaces which can be selected. The three interfaces display different content. When they are not selected, the interfaces will automatically shift. Press the button “PgDn” to select next display interface; press the button “PgUp” to select the previous display interface.
Interface 1:
Line 1: temperature and humidity inside the thermostatic box (or area I);
Line 2: box air conditioner status, real time clock;
※ ------- cooling start sign;
☼ ------- heating start sign;
♂ ------- hydrogen exhaust,/direct ventilation sign;
-- ------- compressor/ heater stop working.
Interface 2:
Line 1: temperature and humidity inside the communication room (or area II);
Line 2: cabinet air conditioner status, real time date;
※------- cabinet air conditioner start sign;
-- ------- cabinet air conditioner off sign.
Interface 3:
Circularly display current alarms;
When multiple alarms occur, it will display each alarm information circularly.
(2)Parameter Mode:
At operating status, long press on the button”PgDn” for around 3 seconds, or press the button”PgUp” at interface 1, to enter parameter mode.The first entered interface is the main menu interface, see the following diagram.

Press the button “▲”, “▼” to choose corresponding parameter group; Press ”PgDn” to enter corresponding parameter group; Press ”PgUp” to return to operating mode. The parameters selection includes:
(a) Observation Parameter (Apar Watch)
(b) Control Parameter Revision (Cpar Update)
(c) Basic Parameter Revision (Bpar Update)
(d) Manual Operation (A/M Select)
(e) Event Query (Event Query)
(f) Return To Operating Mode (Return)
(a)Observation Parameter Group (Apar):
Enter the interface to check some parameters which can’t be checked at operating mode, see “9 Parameters”.
At parameter mode: on the left of line 1 is Parameter No. (PAnn); on the right of line 1 is parameter value. Line 2 shows the remark of the parameter.
(b) Control Parameter Group (CPar):
Enter the interface to observe or revise the parameters which can be revised, see “9 Parameter”.
At parameter mode: on the left of line 1 is Parameter No. (PCnn), on the right of line 1 is parameter value. Line 2 shows the remark of the parameter.
(c) Basic Parameter Group (BPar):
Enter the interface to observe or revise the parameters which can be revised, see “9 Parameter”.
At parameter mode: on the left of line 1 is Parameter No. (PBnn), on the right of line 1 is parameter value. Line 2 shows the remark of the parameter.
(d) Manual Operation:
Enter the interface to select “Cool”, “Heater”, “Air”, “Initpar”, “Aoauto” to conduct manual start and stop operation.
(e) Event Query (Query):
Enter query mode
9. Parameters
Observation Parameters, PA00~PA13: can only be checked, and can’t be revised.

Parameter No.

Parameter Name

Initial Value

Remark

PA00

Vac (mains power supply voltage)


V

PA01

Icomp (compressor current feedback)


fan state monitoring

PA02

Ifan1 (inner fans current feedback)


non-adjustable speed fan

PA03

Ifan2 (outer fans current feedback)


PA04

InFr (inner circulation fans rotation speed)


adjustable speed fan

PA05

OutFr (outer circulation fans rotation speed)


PA06

DI1 (digital input 1)


door alarm sensor

PA07

DI2 (digital input 2)


compressor pressure alarm

PA08

DI3 (digital input 3)


smoke sensor

PA09

DI4 (digital input 4)


water sensor

PA10

ColRN (box air conditioner cooling start times)


times

PA11

ColRT (box air conditioner cooling time length)


0.1hour

PA12

HotRN (box air conditioner heating start times)


times

PA13

HotRT (box air conditioner heating time length)


0.1hour


Control Parameters, PC00~PC17:


Parameter No.

Parameter Name

Initial Value

Remark

PC00

LOC (password parameter)

0

LOC=55, accessible to the following parameters

PC01

colTa (box air conditioner cooling start temperature)

25.0


PC02

colTb (cooling control return difference)

2.0


PC03

hotTa (box air conditioner heating start temperature)

10.0


PC04

hotTb (heating control return difference)

5.0


PC05

ZFanTa (forced ventilation start temperature)

35.0


PC06

ZFanTb (forced ventilation control return difference)

2.0


PC07

TPH (inner temperature alarm upper limit)

30.0


PC08

TPL (inner temperature alarm lower limit)

10.0


PC09

compST (compressor status threshold)

1.0

Unit: A. In case of working, when the feedback current is lower than status threshold or higher than fault threshold, it will be treated as fault and output accordingly.

PC10

compFZ (compressor fault threshold)

10.0

PC11

fanST (fans status threshold)

0.25

PC12

fanFZ (fans fault threshold)

2.0

PC13

pqTd (automatic hydrogen exhaust cycle)

24

Unit: hour

PC14

pqTi (hydrogen exhaust time length)

5

Unit: minute

PC15

Tprotect (compressor protection operation environment temperature)

55.0

°C

PC16

inFanOH (inner fans speed limit)

100


PC17

outFanOH (outer fans speed limit)

100



Basic Parameter, PB00~PB17:


Parameter No.

Parameter Name

Initial Value

Remark

PB00

LOC (password parameter)

0

LOC=55, accessible to the following parameters

PB01

inBT (inside box temperature data compensation)

0.0


PB02

outBT (communication room temperature data compensation)

0.0


PB03

FaultEN (fault operation definition allowed)

Forbid

When allowed, it can operate without feedback.

PB04

hotDef (define heating device)

Forbid


PB05

fanDef (fan definition)

non-adjustable speed

Non-adjustable speed, adjustable speed, inner fan with non-adjustable speed and outer fan with adjustable speed.

PB06

VacX (mains power supply display correction coefficient)

1.00

When the display deviates from the real value, correct scale. Display Value = Real Value × Coefficient.

PB07

IcompX (air conditioner current display correction)

1.00

PB08

fanX (fan feedback current correction coefficient)

1.00

PB09

ADR(address)

1


PB10

BAUD(Baute Rate)

9600


PB11

CESel (Select English or Chinese)

English


PB12

Year (year)

real time


PB13

Month (month)

real time


PB14

Date (day)

real time


PB15

Hour (hour)

real time


PB16

Minute (minute)

real time


PB17

Second (second)

real time



10.Wiring Diagram

Diagram 5: Wiring Diagram

11.Maintenance

Maintenance Tools:
(1)Vacuum cleaner or compressed air cleaning agent
(2)Soft brush
(3)Cross screwdriver
(4)Multimeter
(5)Clamp meter
(6)Digital thermometer
In order to keep normal temperature environment inside the cabinet, please conduct maintenance according to the “Maintenance Table”.
Maintenance Steps:
(1)Turn off the power.
(2)Disconnect the power line, and disconnect the signal line.
(3)Conduct maintenance according to the “Maintenance Table”.
(4)Connect the power line and signal line.
(5)Operating testing program.
(6)Disconnect the power, restore the normal operating status.
(7)Connect the power.
The equipment installation should reserve a maintenance space not less than 300mm.
Maintenance Table

Check Items

Step Description

Maintenance Cycle

Casing

Use brush or vacuum cleaner to clean the odds and ends on the casing.

6 months

Wiring

Check if it gets loose and if the power supply voltage is normal.

6 months

Fans Abnormal

Move the fans to check if the rotation is smooth, and if there’s abnormal noise or odds and ends.

6 months

Cooling Fin

Use brush or vacuum cleaner to clean the dust on the cooling fin; use water or compressed air to clean the condenser.

6 months

Water Drainage

Check if the water drainage pipe is smooth

1 year

Cooling/Heating

At normal operating status, the measured temperature difference between inside and outside temperatures is higher than 10°C.

1 year

Cable

Check if cable peeling occurs.

1 year

Communication Cable

Check if the cable includes hidden danger such as peeling.

1 year

Grounding Cable

Test if the equipment grounding and cabinet grounding is normally connected, and the resistance is lower than 0.1Ω.

1 year


Failures


Failure

Analysis

Air conditioner doesn’t work

Without power input or internal power line may peel.

Temperature failure alarm

The temperature probe terminal may be loose, or the probe doesn’t work.

Fans don’t rotate.

Check if the power supply is normal, if the cables peels or fan blades are blocked by odds and ends.

Fans have abnormal noise.

fan blades are interfered by odds and ends, or fans are damaged.

Can’t drain condensated water.

The water drainage pipe is blocked.



China Customized Inflatable Bumper Ball Game Bubble Adult Grass CE supplier

TC06-160JFL/01,1600W AC220V Air Conditioner,For Outdoor Telecom Shelter/Room/Base Station Images

Inquiry Cart 0
Send your message to this supplier
 
From:
Enter your email please.
To: TIANJIN ESTEL ELECTRONIC SCIENCE AND TECHNOLOGY CO., LTD
Subject:
Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0